Monday, July 8, 2019

Rainy day and Monday


This is what's on my design wall right now.  Finally making a little progress on those 1 1/2 inch finished half square triangle units. This is a Joan Ford Scraps Plus One pattern Scraps Plus One! There are 225 of those pretty little half square's in each of those two strips on the far left.  There are 60 in the small strip set.  I need a total of 900 for 4 strips.  Looking at the bright side, I'm more than halfway there. (smiling)

Slow progress & a quilt for Remy
The quilt on the right is Remy girls bandana's from doggie vacation's over the years.  She deserves a quilt too.
Remy's bandana's aka future quilt
This morning I had every intention on going down to my sewing room and getting to work on these two.  But the sound of a rainy day and Monday equaled slowing down, turning off the AC, and living in the moment.  It rained cat's and dog's this morning into early afternoon.  I did make it down there to the sewing room and worked on an embroidery job that is giving me some fits.  I will save that one for another post.

Until then, happy piecing, happy sewing,
Sheila



No comments:

Popular Posts